Plans that clear review the first time.

MAD Civil produces land development packages for developers in Florida, South Carolina and Northern Mindanao. Drawn to US permitting standards, signed and sealed by a PRC licensed Civil Engineer.

What we draw

Three practice areas, one production standard. Every package ships with the calculations behind it.

Subdivisions

  • Lot layout and yield studies
  • Road geometry and profiles
  • Grading and earthwork balance
  • Road drainage
  • Water distribution
  • Sewerage and STP coordination
  • BP 220 and PD 957 packages

Commercial sites and parking

  • Site development plans
  • Pad grading
  • Access and driveway geometry
  • Parking layout and stall yield
  • Truck turning templates
  • Pavement sections
  • Utility coordination

Water resources

  • Hydrology from PAGASA RIDF data
  • HEC-HMS watershed modelling
  • HEC-RAS floodplain hydraulics
  • Storm drain network design
  • Detention and retention sizing
  • Culvert and outfall design
  • Drainage impact studies

Every sheet comes out of a model

Quantities and drainage results are computed from the surface and the pipe network, not estimated from a drawing. When the design changes, the numbers change with it.

Survey and criteria

Existing surface built from your survey. Design criteria confirmed against the governing code before anything is drawn.

Model

Corridors, grading objects and pipe networks built in Civil 3D against that surface.

Analysis

Hydrology and hydraulics run in HEC-HMS and HEC-RAS. Earthwork and pipe quantities taken straight from the model.

Submittal

Signed and sealed sheets, the calculation package, BOQ support, and responses to review comments.

Codes we design to

Two regulatory environments, held to the stricter of the two wherever they overlap.

United States

  • FDOT design standards
  • Miami-Dade County land development code
  • County and municipal drainage criteria
  • ADA accessibility requirements

Philippines

  • DPWH Design Guidelines (DGCS)
  • National Building Code (PD 1096)
  • BP 220 and PD 957
  • DHSUD submittal requirements
  • Local drainage ordinances

The engineer who seals your plans is the one who drew them

No handoffs to a drafting pool and no borrowed signature. You deal directly with the principal from the first concept layout through to the last review comment.

That is also the limit on how much work we take. If a programme is bigger than the practice can hold to this standard, we say so before you commit.

  • PrincipalMarvie Angelo B. Damasing
  • LicencePRC Registered Civil Engineer, No. 0000000
  • Practising since2023
  • SoftwareCivil 3D, HEC-HMS, HEC-RAS, AutoCAD
  • MarketsUnited States and the Philippines

Project experience

Work performed by the principal for land development firms in the United States and the Philippines.

  • Single-family residential grading and drainageMiami-Dade County, Florida
  • Commercial site and parking, variance submittalHallandale Beach, Florida
  • Utility permit plans and pavement restorationFDOT District Six
  • Concept site plan, flex industrialWinter Haven, Florida
  • Drainage structure shop drawing reviewNorth Miami, Florida
  • Subdivision land development designCagayan de Oro, Misamis Oriental

Project names and clients withheld under confidentiality. References available on request.

Send us a lot plan and see what we do with it.

A survey or a lot plan is enough to start. You get back a concept layout, a drainage approach and a fee proposal within three working days, at no cost.